
| Citation: | ZHOU Chun-ming. Reliability Estimation Method of Torpedo in Multimode Condition[J]. Journal of Unmanned Undersea Systems, 2010, 18(6): 419-421. doi: 10.11993/j.issn.1673-1948.2010.06.005 |
| [1] |
周春明. 鱼雷试验评定模型研究[J]. 鱼雷技术, 2008, 16(4): 3-9.
Zhou Chun-ming. Novel Evaluation Model of Torpedo Test[J]. Torpedo Technology, 2008, 16(4): 3-9.
|
| [2] |
陈水利. 模糊集理论及其应用[M]. 北京: 科学出版社,2005.
|
| [3] |
盛骤, 谢式千,潘承毅. 概率论与数理统计[M]. 北京: 高等教育出版社,2005.
|
| [4] |
陈胜军. 模糊可靠度的区间估计方法[J]. 机械设计与制造, 2005,(12): 10-11.
Chen Sheng-jun. Method of Interval Estimation of Fuzzy Reliability[J]. Machinery Design & Manufacture, 2005,(12): 10-11.
|
| [5] |
陈胜军. 模糊可靠度置信区间的确定方法初探[J]. 机械设计, 1998, 15(1): 33-35.
Chen Sheng-jun. Method of Interval Determination on Fuzzy Reliability[J]. Journal of Machine Design, 1998, 15(1): 33-35.
|
| [6] |
董安正, 赵国藩. 建筑结构模糊可靠度置信区间的确定方法[J]. 建筑结构学报, 2003, 24(2): 83-85.
Dong An-zheng, Zhao Guo-fan. Methods of Determina- tion on Confi- dence Interval of Building Structure Fuzzy Confidence Level[J]. Journal of Building Struc- tures, 2003, 24(2): 83-85.
|