Discussion on Torpedo Operation Test Scheme in Design Acceptance Phase
-
摘要: 在拓展以往鱼雷型号设计定型试验项目设置和加大考核力度的基础上, 以鱼雷在技术阵地的贮存、维修维护、技术准备、转场运输和海上对抗条件下实航攻击检验试验等寿命剖面事件为牵引, 对设计定型阶段鱼雷作战试验方案进行探讨, 设计了初步的鱼雷作战试验方案和战雷实射检验试验结果评定标准, 为靶场对鱼雷装备进行作战试验鉴定做出有益探索。Abstract: Through increasing test items and enhancing assessment degree in design acceptance phase of a torpedo, we discuss the scheme of torpedo operation test in design acceptance phase with regard to the life profiles events in techni-cal position, such as storage, maintenance, preparing, transportation and attack check test under countermeasure condi-tion on the sea, and design a preliminary scheme of torpedo operation test with corresponding evaluation criterions of real shoot check test result for a torpedo. This study may facilitate torpedo operation test and evaluation in torpedo range.
-
Key words:
- torpedo /
- design acceptance /
- operation test
-
[1] 王凯, 赵定海, 闫耀东, 等. 武器装备作战试验[M]. 北京: 国防工业出版社, 2012: 3-7, 51-113. [2] 孟庆玉, 张静远, 宋保维. 鱼雷作战效能分析[M]. 北京: 国防工业出版社, 2003: 22-45. [3] 武小悦, 刘琦. 装备试验与评价[M]. 北京: 国防工业出版社, 2008: 131-191. [4] 石君友. 测试性设计分析与验证[M]. 北京: 国防工业出版社, 2011: 295-308. [5] 宋保维, 李彩霞, 梁庆卫, 等. 鱼雷加速可靠性试验体系[J]. 火力与指挥控制, 2010, 35(7): 1-3, 8.Song Bao-wei, Li Cai-xia, Liang Qing-wei, et al. An Intro-ductory Review of Torpedo Accelerated Reliability Test[J]. Fire Control and Command Control, 2010, 35(7): 1-3, 8. [6] 张静远. 鱼雷作战使用与作战能力分析[M]. 北京: 国防工业出版社, 2003: 133-149. [7] 康锐, 屠庆慈. 可靠性维修性保障性工程基础[M]. 北京: 国防工业出版社, 2012. [8] 马麟. 保障性设计分析与评价[M]. 北京: 国防工业出版社, 2012: 197-230.
点击查看大图
计量
- 文章访问数: 970
- HTML全文浏览量: 2
- PDF下载量: 733
- 被引次数: 0